MVROT Pilot Project in Manitoba

Posted: May 20, 2020

Here you can read and download our Pilot Project report. Scroll down below to find the supporting documents referenced in the paper.



Supporting documents

Clicking on the links below will open a pdf.

1a-GRAPHICAL REPRESENTATION OF MVROT_Voltage Analyses_02-JAN to 17-JAN 2020
1b-GRAPHICAL REPRESENTATION OF MVROT_Energy Efficiency Analyses_02-JAN to 17-JAN 2020
1c-GRAPHICAL REPRESENTATION OF MVROT_Voltage Analyses_03-JAN to 16-JAN 2020
1d-GRAPHICAL REPRESENTATION OF MVROT_Energy Efficiency Analyses_03-JAN to 16-JAN 2020
2a-GRAPHICAL REPRESENTATION OF MVROT_Voltage Efficiency Analyses_28-JAN to 06-FEB 2020
2b-GRAPHICAL REPRESENTATION OF MVROT_Energy Efficiency Analyses_28-JAN to 06-FEB 2020
3a-Amperage at Estella Substation BASELINE - NO MVROT Analyses_02-JAN-2020 to 09-JAN-2020
3b-Amperage at Estella Substation WITH MVROT Analyses_30-JAN-2020 to 06-FEB-2020
3c-Amperage at Estella Substation BASELINE and WITH MVROT Analyses_02-JAN-2020 to 06-FEB-2020
4a-Amperage in NEUTRAL at Estella Substation BASELINE and WITH MVROT Analyses_02-JAN-2020 to 06-FEB-2020
4b-Percentage of Amperage reduction in NEUTRAL at Estella Substation BASELINE and WITH MVROT Analyses_02-JAN-2020 to 06-FEB-2020
5a - Amperage analyses at MVROT location - Phase A and phase B loads with MVROT energized_30-JAN to 06-FEB 2020
5b - Amperage analyses at MVROT location - MVROT Secondary Phase a and Neutral loads with MVROT energized_30-JAN to 06-FEB 2020
5c - Amperage analyses at MVROT location - Amperage changes in lines to substation with MVROT energized_30-JAN to 06-FEB 2020
5d-Amperage analyses at MVROT location - Power losses ratio in lines without MVROT with MVROT energized_30-JAN to 06-FEB 2020
EGC-MH-02-18-022-Rev A
EGC-MH-02-18-023-Rev A